But don't forget the cost of the approved type invertor and associated equipment to tie into the grid, installation by an approved engineer, plus that of the inevitable EDF inspection of the installation.
   Report 
   07/05/2008, 14:21
EcoPower is not online. Last active: 03/07/2008 08:58:13 EcoPower

Not Ranked
Joined on 07/05/2008
Posts 32
Re: Flogging 'leccy to EDF
Reply Quote

Most of the info here is correct but for EDF to buy they have to install net metering equiptment - between 800 to 1200€. The contract typically runs for 20 years and it is expected the buy back rates will change next year - this is happening in other EU countries at present

For wind it usually depends whether you are in a Zone Eolienne. There is also a limit to the size of turbine (watts) whihc if you exceed you need a license.

Approved Inverters are G83 which is not a standard yet but a recommendation - however without it they certainly wont connect you. Typical G83 inverters costs from 600€ upwards.

Lots to think about

Marc


www.ecopower.eu.com

Renewable Energy need not cost the Earth
   Report 
  Page 2 of 2 (11 items) < 1 2
France Forum » General Discuss... » Other Topics » Re: Flogging 'leccy to EDF

Powered by Community Server, by Telligent Systems

Please note that any unsolicited advertising will be removed